time2015/08/18
Throughout shower room installed there the following points should be noted:
1. embedded pore size should be designed bathroom renovation before;
2. leakage protection and other wiring switching devices should be considered before installing the shower room is good, in order to avoid rework;
3. shower room styles to be based on the layout of the bathroom;
4. shower rooms must be firmly connected to the building structure;
5. have been installed before you installthe shower room well if the water supply system and tile, best custom shower.
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2025 Tradevv.com. All rights reserved.